Inspector Notes
Gate Code: 0513
Permit Timeline
In Review
6/30/2026
Issued
08/13/2026
UNDERSLAB PLUMBING
07/14/2026
C&R
UNDERSLAB PLUMB
07/16/2026
PASS
FOOTING
07/21/2026
PASS
WALL SHEATHING
08/13/2026
PASS
MOISTURE BARRIER
09/04/2026
C&P
ROUGH BUILDING
09/08/2026
C&R
ROUGH BUILDING
09/10/2026
C&P
INSULATION
09/15/2026
PASS
Permit Finaled
Certificate Issued
Project Information
Edmunds #
P-150726
MC #
MC2026-398
Issued Date
08/13/2026
Finaled Date
—
Owner
CAMERON & BROOKE ANDERSON
Owner Address
100 E WATSON RD, FORSYTH, GA 31029
Contractor
SELF CONTRACTING
Project Type
ACCESSORY STRUCTURE
Description
DETACHED METAL ACCESSORY BUILDING
Technical Details
Construction Type
II-B
Occupancy Group
U
Occupant Load
N/A
Square Footage
1800
Zoning
A-R
Sprinklers
NO
APN
073 031G
Limitations
NONE
Inspection History
| Date | Type | Inspector | Result | Notes |
|---|---|---|---|---|
| 09/15/2026 | INSULATION | Tyler Adams | PASS | — |
| 09/10/2026 | ROUGH BUILDING | Tyler Adams | CORRECT AND PROCEED | - INSULATE 3/4 HOT WATERLINES IN JACK AND JILL RESTROOM WALLS AND CEILING - BOND METAL BOXES WITH GREEN BOND SCREW, HAS TO BE MECHANICALLY THREADED INTO BOX - INSULATOR WILL NEED TO HAVE VAPOR BARRIER BETWEEN INSULATION AND ANT TUB INSERT ON EXTERIOR WALL IN JACK AND JILL BATHROOM - SEAL BENEATH TUB ON SECOND FLOOR OKAY TO PROCEED WITH INSULATION |
| 09/08/2026 | ROUGH BUILDING | Tyler Adams | CORRECT AND RECALL | - INSULATE ALL 3/4 HOT WATERLINES - MISSING HANGERS BENEATH LANDING IN STAIRWELL - WILL THERE BE AAV VENTS BENEATH EACH VANITY/SINK? - STUD OVER-NOTCHED IN POWDER ROOM FOR DRAIN AT VANITY - DRAFT BLOCK CASED OPENING TO DINING ROOM - BOND ALL METAL BOXES - FASTEN POST BRACKETS WITH 10D NAILS - REPLACE NM-B CABLE TO ISLAND WITH UF CABLE - FIR OUT WALL AT ELECTRICAL PANEL IN MECHANICAL ROOM TO MAINTAIN R-VALUE, IF THE THERMAL ENVELOPE DOESN’T EXTEND TO THAT WALL, DISREGARD CORRECTION - BOND TO UFER - ELECTRICAL ROUGH INCOMPLETE |
| 09/04/2026 | MOISTURE BARRIER | Tyler Adams | CORRECT AND PROCEED | SEAL TRADE PENETRATIONS TO MOISTURE BARRIER |
| 08/13/2026 | WALL SHEATHING | Tyler Adams | PASS | — |
| 07/21/2026 | FOOTING | Tyler Adams | PASS | — |
| 07/16/2026 | UNDERSLAB PLUMB | Tyler Adams | PASS | — |
| 07/14/2026 | UNDERSLAB PLUMBING | Tyler Adams | CORRECT AND RECALL | - INSULATE ALL UNDERSLAB HOT WATERLINES PER ENERGY CODE - TRENCH WAS FLOODED COULD NOT VERIFY SLOPE, COULD NOT VERIFY THAT PIPE WAS LAID ON CONTINUOUS FILL, COULD NOT VERIFY THAT DRAIN WAS SLEEVED BENEATH FOUNDATION |