This permit has 2 inspection(s) on record but its status is IN REVIEW — not ISSUED. Inspections should only be performed on issued permits. Update the status if this permit has been issued.
Permit Timeline
⬤ In Review
6/22/2026
Issued
FRAMING ROUGH
07/14/2026
C&R
MOISTURE BARRIER
8/11/2026
PASS
Permit Finaled
Certificate Issued
Project Information
Edmunds #
—
MC #
MC2026-383
Issued Date
—
Finaled Date
—
Owner
MILTON HEARD
Owner Address
295 COUNTRY CLUB RD MACON
Contractor
IVEY BLDS
Project Type
—
Description
CHURCH/HALL ADDITION INCLUDING PEWS, 4X9 STAGE, HVAC, CATHEDRAL RIDGE, SCONCES, CONCRETE PORCH, RAMP, AND 24X25 OPEN CARPORT
Technical Details
Construction Type
—
Occupancy Group
—
Occupant Load
—
Square Footage
—
Zoning
—
Sprinklers
—
APN
—
Limitations
—
Inspection History
| Date | Type | Inspector | Result | Notes |
|---|---|---|---|---|
| 8/11/2026 | MOISTURE BARRIER | TYLER ADAMS | PASS | — |
| 07/14/2026 | FRAMING ROUGH | Tyler Adams | CORRECT AND RECALL | - 3x3 nail grid not met at garage posts corners on sheathing - 1000 lb straps needed from top plate to below garage headers - sill plate anchors needed with in 12 inches of any breaks or joints in exterior sill plate, and every six feet in between - nail off to both studs on garage posts every 2 inches - plumbing and electrical not roughed |