Permit Timeline
In Review
5/20/2026
Issued
UNDERSLAB PLUMBING
06/09/2026
PASS
FOUNDATION
06/16/2026
PASS
ROUGH BUILDING
09/11/2026
C&R
SHEATHING
09/11/2026
C&R
MOISTURE BARRIER
09/14/2026
PASS
WALL SHEATHING
09/14/2026
PASS
ROUGH BUILDING
09/22/2026
C&P
INSULATION
09/29/2026
PASS
+1 More
Permit Finaled
Certificate Issued
Project Information
Edmunds #
P-110626
MC #
MC2026-356
Issued Date
—
Finaled Date
—
Owner
MEREDITH HOMES INC
Owner Address
76 VAUGHN SCHOOL RD, GRIFFIN, GA 30223
Contractor
MEREDITH HOMES INC
Project Type
NEW SINGLE FAMILY RESIDENTIAL
Description
NEW CONSTRUCTION
Technical Details
Construction Type
V-B
Occupancy Group
R-3
Occupant Load
N/A
Square Footage
3,559
Zoning
A-R
Sprinklers
NO
APN
052 019B
Limitations
NONE
Inspection History
| Date | Type | Inspector | Result | Notes |
|---|---|---|---|---|
| 09/29/2026 | INSULATION | Tyler Adams | PASS | — |
| 09/29/2026 | ROUGH BUILDING | Tyler Adams | PASS | — |
| 09/22/2026 | ROUGH BUILDING | Tyler Adams | CORRECT AND PROCEED | - MISSING INSULATION AND VAPOR BARRIER ON EXTERIOR WALL PORTION OF TUB - SEAL HOLE BENEATH SECOND FLOOR TUB - NAIL GUARDS NEEDED OVER ELECTRICAL PENETRATIONS OVER GARAGE HEADER - DRAFT BLOCK OVER PANEL - STUD SHOE NEEDED OVER RIGHT DRAIN ARM IN MASTER BATHROOM - STUD NEEDS TO BE REPAIRED WHERE UNUSED OVERBORED HOLE IS BETWEEN MASTER VANITIES - STUD SHOE NEEDED OVER RIGHT DRAIN ARM IN SECONDARY SECOND FLOOR BATHROOM A SMOKE DETECTOR TOO CLOSE TO FAN BOX IN FRONT RIGHT SECOND FLOOR BEDROOM. MUST BE 36 INCHES AWAY FROM EDGE OF FAN BLADES OF FUTURE FAN - NO TEST IN WATERLINES - STUD SHOES NEEDED OVER DRAIN ARM TO WASHING MACHINE STAND PIPE - |
| 09/14/2026 | MOISTURE BARRIER | Tyler Adams | PASS | — |
| 09/14/2026 | WALL SHEATHING | Tyler Adams | PASS | — |
| 09/11/2026 | ROUGH BUILDING | Tyler Adams | CORRECT AND RECALL | - ELECTRICAL NOT ROUGHED - SHEATHING HAS NOT BEEN PASSED - 3X3 FASTENING GRID DOES NOT SEEM TO HAVE BEEN MET AT GARAGE POST CORNERS |
| 09/11/2026 | SHEATHING | Tyler Adams | CORRECT AND RECALL | - MOISTURE BARRIER INSTALLED PRIOR TO PASSING SHEATHING - 3X3 FASTENING GRID DOES NOT SEEM TO HAVE BEEN MET AT GARAGE POST CORNERs |
| 06/16/2026 | FOUNDATION | Tyler Adams | PASS | — |
| 06/09/2026 | UNDERSLAB PLUMBING | Tyler Adams | PASS | — |