Permit Timeline
In Review
6/1/2026
Issued
06/03/2026
UNDERSLAB PLUMBING
07/14/2026
PASS
FOOTING
07/16/2026
PASS
WALL SHEATHING
08/17/2026
PASS
MOISTURE BARRIER
08/20/2026
C&R
MO
08/24/2026
C&P
COMBINATION ROUGH
09/23/2026
C&R
ROUGH BUILDING
09/29/2026
C&P
COMBINATION ROUGH
10/05/2026
PASS
+1 More
Permit Finaled
Certificate Issued
Project Information
Edmunds #
P-310626
MC #
MC2026-341
Issued Date
06/03/2026
Finaled Date
—
Owner
GEORGE EMAMI
Owner Address
1000 HALONA LOOP, FORSYTH, GA 31029
Contractor
PRIMEPOINT VENTURES
Project Type
NEW SINGLE FAMILY RESIDENTIAL
Description
NEW CONSTRUCTION
Technical Details
Construction Type
V-B
Occupancy Group
R-3
Occupant Load
N/A
Square Footage
3,734
Zoning
RLMD
Sprinklers
NO
APN
054C057
Limitations
NONE
Inspection History
| Date | Type | Inspector | Result | Notes |
|---|---|---|---|---|
| 10/19/2026 | PERMANENT POWER | Tyler Adams | PASS | — |
| 10/05/2026 | COMBINATION ROUGH | Tyler Adams | PASS | — |
| 09/29/2026 | ROUGH BUILDING | Tyler Adams | CORRECT AND PROCEED | - bond to ufer from exterior through brick - bond as gas line is concealed in wall needs to be accessible - stub up conduit at island |
| 09/23/2026 | COMBINATION ROUGH | Tyler Adams | CORRECT AND RECALL | - draft blocking over panel - remove green bond screw from panel - stud shoe needed over drain arm to vanity in powder room - missing hangers on two TGI joist over head in laundry room beneath stair landing - no pressure on waterlines - nail guards needed over waterline to ice maker box on laundry room - bond to ufer - smoke detector in master bedroom ceiling appears to be too close to edge of future ceiling fan blades - improper connection of sealtite to floor outlet boxes - pancake box box on back porch is over box fill with two cable penetrations - draft block concealed space to right of shower in second floor bathroom - secure cables to framing members in atticq |
| 08/24/2026 | MO | Tyler Adams | CORRECT AND PROCEED | - TAPE PENETRATIONS TO HOUSE WRAP |
| 08/20/2026 | MOISTURE BARRIER | Kyle Golberg | CORRECT AND RECALL | NOT ALL WINDOWS AND DOORS INSTALLEd |
| 08/17/2026 | WALL SHEATHING | Tyler Adams | PASS | — |
| 07/16/2026 | FOOTING | Tyler Adams | PASS | — |
| 07/14/2026 | UNDERSLAB PLUMBING | Tyler Adams | PASS | — |