Permit Timeline
In Review
10/3/2025
Issued
ROUGH BUILDING
08/26/2026
C&R
ROUGH BUILDING
10/16/2026
PASS
Permit Finaled
Certificate Issued
Project Information
Edmunds #
P-211025
MC #
MC2026-257
Issued Date
—
Finaled Date
—
Owner
MARK & SKYLAR LUMSDEN
Owner Address
300 CREEKSIDE TRAIL, FORSYTH, GA 31029
Contractor
BG DEVELOPMENT & INVESTMENT LLC
Project Type
NEW SINGLE FAMILY RESIDENTIAL
Description
NEW SFR
Technical Details
Construction Type
—
Occupancy Group
—
Occupant Load
—
Square Footage
3460
Zoning
—
Sprinklers
—
APN
056A027A
Limitations
—
Inspection History
| Date | Type | Inspector | Result | Notes |
|---|---|---|---|---|
| 10/16/2026 | ROUGH BUILDING | Tyler Adams | PASS | — |
| 08/26/2026 | ROUGH BUILDING | Tyler Adams | CORRECT AND RECALL | - missing sill plate anchors through out garage and breezeway - missing hangers under landing to stairs in garage - no support beneath landing front right side of landing in garage - windows in breezeway by stairs need to be tempered glass - boca plates required over plumbing penetrations to top and bottom plates - plumbing vents in laundry area have not been extended to exterior - bathe fans need to be vented to exterior - insulate waterlines in exterior walls - bath fan required in master bathroom where freestanding tub will be - - hangers needed where return register was cut into ceiling outside master bedroom - bond all metal electrical boxes - make up service cable in electrical panels - no water on tubs and drains - engineered beams need to be hung with hangers not ledger strips, or have engineers approval - smoke detectors need to be with in twelve inches of the ceiling when wall mounted - no mastic in ac registers - hurricane ties missing on rafter connections - top hung web trusses over head at bases of stairs in basement are not fully bearing in the sill plate - sill plate anchors missing in exterior wall of basement - insulate all 3/4 hot waterlines - nm-b cable under the deck needs to be UF cable - waterlines to framing members in crawlspace - waterline and gas lines need to be sleeved through block wall and crawlspace - Bond to gas line - secure, gas line to framing members in crawlspace - CCST gas line cannot be in contact with gusset plates |