Permit Timeline
In Review
4/7/2026
Issued
WALL SHEATHING
07/13/2026
PASS
MOISTURE BARRIER
07/24/2026
PASS
ROUGH BUILDING
07/24/2026
C&R
ROUGH BUILDING
07/31/2026
PASS
INSULATION
08/10/2026
PASS
ROUGH BUILDING
08/12/2026
CANCE
GAS TEST
08/12/2026
PASS
PERMANENT SERVI
10/08/2026
PASS
Permit Finaled
Certificate Issued
Project Information
Edmunds #
P-420426
MC #
MC2026-136
Issued Date
—
Finaled Date
—
Owner
LESLIE THOMAS
Owner Address
118 LAKESIDE DR, FORSYTH, GA 31029
Contractor
GO CLEAN CO
Project Type
NEW SINGLE FAMILY RESIDENTIAL
Description
NEW SFR
Technical Details
Construction Type
—
Occupancy Group
—
Occupant Load
—
Square Footage
4265
Zoning
—
Sprinklers
—
APN
F23 014
Limitations
—
Inspection History
| Date | Type | Inspector | Result | Notes |
|---|---|---|---|---|
| 10/08/2026 | PERMANENT SERVI | Tyler Adams | PASS | — |
| 08/12/2026 | ROUGH BUILDING | Tyler Adams | CANCEL | — |
| 08/12/2026 | GAS TEST | Tyler Adams | PASS | — |
| 08/10/2026 | INSULATION | Tyler Adams | PASS | — |
| 07/31/2026 | ROUGH BUILDING | Tyler Adams | PASS | — |
| 07/24/2026 | MOISTURE BARRIER | Tyler Adams | PASS | — |
| 07/24/2026 | ROUGH BUILDING | Tyler Adams | CORRECT AND RECALL | - fir out wall at electrical panel to maintain r value, unless thermal envelope is being extended to the wall of the closet facing the garage - stud shoes needed over drain arm to laundry sink - draft blocking concealed space where walls were firred out at master vanities - insulate all 3/4 hot waterlines - roof not installed - plumbing vent flashings not installed - no insulation until roof is completely dried in - no pressure on gas line - fireplace not wired - |
| 07/13/2026 | WALL SHEATHING | Tyler Adams | PASS | — |