Permit Timeline
In Review
4/3/2026
Issued
10/21/2026
UNDERGROUND/ SLAB PLUMBING
6/1/2026
PASS
SHEATHING
07/08/2026
PASS
MOISTURE BARRIER
07/24/2026
PASS
GAS TEST
07/24/2026
PASS
ROUGH BUILDING
07/30/2026
C&R
ROUGH BUILDING
08/04/2026
PASS
INSULATION
08/10/2026
PASS
PERMANENT SERVI
09/08/2026
PASS
+2 More
Permit Finaled
10/19/2026
Certificate Issued
10/25/2026
Project Information
Edmunds #
P-360426
MC #
MC2026-134
Issued Date
10/21/2026
Finaled Date
10/19/2026
Owner
JONATHAN GARMAN & KELLIE FENNELL
Owner Address
2405 LASSITER RD, FORSYTH, GA 31029
Contractor
JONATHAN GARMAN & KELLIE FENNELL
Project Type
NEW SINGLE FAMILY RESIDENTIAL
Description
NEW SFR
Technical Details
Construction Type
V-B
Occupancy Group
R-3
Occupant Load
N/A
Square Footage
4501
Zoning
A-R
Sprinklers
NO
APN
073 048
Limitations
NONE
Inspection History
| Date | Type | Inspector | Result | Notes |
|---|---|---|---|---|
| 6/1/2026 | UNDERGROUND/ SLAB PLUMBING | TYLER ADAMS | PASS | — |
| 10/19/2026 | FINAL | Tyler Adams | PASS | — |
| 10/14/2026 | FINAL | Tyler Adams | CORRECT AND RECALL | - all exterior outlets need to be marked WR for wet/damp locations - label condenser disconnects in relation to their breaker label at panel - strap 1.5 inch conduit out of disconnect to left of condensers - paint exterior black iron gas line and fittings to prevent corrosion - strap 3/4 conduit to right of meter combo - label breaker in service panel at meter combo - label air handlers and condensers in panel so that they are distinguishable from one another example 1 and 2 A and B - bathroom outlets require 20 amps - breakers 12 and 13 require afci protection - loose UF cable under kitchen sink needs to be in a box and protected where exposed - no outlet at kitchen island, required with ga amendment as of Jan 1 2026 - only first outlet in a series requires the gfci outlet, all down stream outlets are protected off of the load side of the gfci outlet - hand rail from landing to top floor needs to be continuous to the top riser, there is no hand rail from where it terminates to the newel post to the rope riser - seal tite conduit needs to be attached to air handlers with approved fittings |
| 09/08/2026 | PERMANENT SERVI | Tyler Adams | PASS | — |
| 08/10/2026 | INSULATION | Tyler Adams | PASS | — |
| 08/04/2026 | ROUGH BUILDING | Tyler Adams | PASS | — |
| 07/30/2026 | ROUGH BUILDING | Tyler Adams | CORRECT AND RECALL | - ONE OUTLET IN GARAGE HAS TO BE 20 AMPS REQUIRED BRANCH CIRCUIT - GET GROUND REQUIRED TO BE # 6 COPPER - SMOKE DETECTOR NOT ALLOWED IN GARAGE PER NFPA 72 - INSULATE ALL 3/4 HOT WATERLINES PER ENERGY CODE - STUD SHOE NEEDED OVER DRAIN ARM TO VANITY IN POWDER ROOM - NM-B NOT PERMITTED TO BE IN RACEWAY BENEATH SLAB, NEEDS TO BE TYPE UF CABLE. CONSIDERED DAMP LOCATION - NO WATER ON DRAINS AND TUBS - SEAL HOLE BENEATH TUB ON SECOND FLOOR |
| 07/24/2026 | MOISTURE BARRIER | Tyler Adams | PASS | — |
| 07/24/2026 | GAS TEST | Tyler Adams | PASS | — |
| 07/08/2026 | SHEATHING | Tyler Adams | PASS | — |